Wan Chai MTR Station | Dragages Hong Kong
Railway

Wan Chai MTR Station

Completed Project

Building on its success with the MTR Corporation, a Dragages joint venture was tasked with constructing a station concourse to link the existing underground network with a pedestrian subway under the busy streets of the Wan Chai district.

Using a top-down method and a 1.2-metre thick diaphragm wall, the station was constructed 26 metres below street level.

Client MTR Corporation
Joint-venture project Construction of a station concourse
Construction period 1982 - 1985